Back to All Projects

Master Bath Trim Installation

Lake City, FL1 dayTrim

Before & After

After
Before
Before
After

Drag the slider to compare before and after

The Problem

The bathroom renovation required all new trim to match the updated modern design. The existing trim was outdated and didn't complement the new fixtures and finishes.

Our Solution

We installed moisture-resistant MDF baseboards throughout the bathroom, replaced door casings with a contemporary profile, applied proper caulking at all joints and transitions, and finished with two coats of semi-gloss paint for moisture resistance.

Need Similar Work Done?

Contact us today for a free estimate on your trim project.